Herein we are telling you about the construction of the comfort-class residential complex "Shchaslyvyi Grand" in Sofiyivska Borshchahivka.
The second section has been commissioned. Work is underway to connect it to the electricity and gas supply networks, as well as to prepare for the signing of the main notarized contracts.
In the third section, the installation of fire protection systems has been completed. Work is ongoing on the facade (98% complete), floor screeding (95% complete), installation of railings (95% complete), installation of service doors (99% complete), electrical work (95% complete), installation of apartment doors (95% complete), and finishing work (55% complete). Landscaping work around the building section has begun, and preparations for commissioning are underway.
In the fourth section, concrete work on the 8th floor and the technical floor has been completed. Work is underway on the construction of walls and partitions (80% complete), preparations for window installation, and preparations for the start of installation work on the water supply and sewer systems.
In the fifth section, concrete work is underway on the 8th floor, along with the construction of walls, partitions and the fabrication of windows.
In the sixth section, the foundation slab has been completed. Monolithic work has begun on the basement floor.
In the underground parking lot, the installation of fire protection systems in sections 1-3 has been completed. Work is ongoing on landscaping between sections 1 and 2 (80% complete), the installation of fire protection systems in section 5, preparations for electrical work, and the installation of industrial flooring.