1

CONSTRUCTION OF THE RC "CRYSTAL AVENUE": MONOLITHIC WORKS IN THE FINAL PHASE COMPLETED

07.06.2023

Summer is a hot time, especially at the construction site of the residential complex "Crystal Avenue", which we talk about in our traditional monthly digest.

In the second phase (11-A, Oksamytova St.) hall finishing and works on connecting gas supply networks have been completed. Works on connecting power supply networks, waterproofing works, and landscaping of the territory are ongoing.

In the fourth phase (1, Kryshtaleva St.) the installation of the ventilated facade (90% ready), the installation of the wet facade (90% ready), the gasification of the building (70% ready) and the installation of fire equipment (90% ready) are in progress. Work on the improvement of the territory has begun.

In the fifth phase (1-B, Kryshtaleva St.) monolithic works on the 18th floor have been completed and brickwork on the 11th floor has begun.

You can find out details about the construction or the terms of purchasing housing by phone: +380960230310.