1

Happy News for Shchaslyvyi Investors

21.04.2017

In a short time the dwellers at 50 Shchaslyva Str. will be giving a housewarming party in their warm and cozy apartments in the Shchaslyvyi residential complex! Every apartment is equipped with radiators, ready for use gas boilers and sanitary outputs. As a result purchasers of apartments in the commissioned house at 50 Shchaslyva Str. will be able to do repair works from the end of September till winter. Entrance doors have been installed in all apartments. Works on the pouring of cement screed on floors are finished in all premises. Walls in the building’s entrances puttied. Office premises all ready! Floors tiled and doors installed in the non-residential area. Please be reminded that apartments of this house are sold with all appropriate documents already.

Builders are finishing the facade insulation along with the water drainage mounting at 61 Shchaslyva Str., whereas high-rise construction workers have already installed chimney caps. In the meantime works inside the building progress rapidly. Painters putty walls in entrances of the 4th section and finish pouring the cement screed. Next week the tiling will begin in entrances. Walls in apartments are plastered, window sills installed, whereas the mounting of drip edges is expected this week. The installation of entrance doors in apartments will be over soon. The installation of radiators all over the building draws to its end too. The house has electricity supply. The mounting of sanitary outputs is just about to finish. The only thing that needs to be done in all office premises is painting and tiling. The pouring of cement screed on floors will also begin in the basement area this week.

The bringing into operation of the house at 50 Shchaslyva Street took place in August 2014. The house 61 will be fully commissioned in December this year. For this reason the buildings are being dynamically connected to utility systems: water supply was distributed to half of apartments in the house 50 last week; everything is ready for the connection to electricity supply; in the nearest time gas pipes welding will begin in the house 61, and in the commissioned house there proceed energetic inside works on gas supply piping and standpipes welding.

As one may see the construction of the RC “Shchaslyvyi” in Sofiivska Borshchagivka is at its final stage. So do not postpone your family’s most vital purchase! Arrange the on-site review of the apartment of your dream right now: 044-223-76-76, 067-735-76-76.